Standard Drawings
Please refer to the following drawings when referenced on any construction drawing or documents issued by Ottawa River Power:
- SDUG001 – Transformer Base Installation
- SDUG002 – Transformer Base 3 Phase
- SDUG003 – Transformer Base 1 Phase
- SDUG004 – Duct Bank Installation
- SDUG005 – Utility Trench Cross Sections
- SDUG006 – Transformer Base Grounding
- SDUG007 – Pembroke Standard 20m Road Section
- SDUG008 – Bollard Installation
- SDUG009 – Four Party Service Trench
- SDUG0010 – Typical Service Trench